CONSTRUCTION

RAIL SYSTEMS

Çekmeköy - Sancaktepe - Sultanbeyli Metro & Sarıgazi (Hospital) - Taşdelen - Yenidoğan Metro

The project for which a contract was signed in April 2017 is being carried out by a joint venture including Özaltın Construction as a member.

The project for which a contract was signed in April 2017 is being carried out by a joint venture including Özaltın Construction as a member.

The project covers procurement, assembly and commissioning of the electromechanical systems of these two lines along with their construction.

Detail

Sivas – Erzincan High-Speed Railway Project, Section I

The project of which contract was signed in September 2017 has been performing by a Joint-Venture where Özaltın Construction is a member.

When the project is completed, the travel time between Sivas and Erzincan is planned to be 1,5 hours.

Detail

Palu – Genç – Muş Railway Replenishment Project

The construction of the project is carried out expeditiously by the partnership of which Özaltin is a member.

The project is planned to be completedin September 2018.

Detail

Palu- Genç- Muş Railway Project

The construction of Kalehan Energy Projects launched in parallel with the energy demands of Turkey necessitated the reconstruction of Palu- Genç- Muş Railway Project.

Özaltın and Samsung C&T Joint Venture was awarded the contract for this Project by the Republic of Turkey, General Directorate of Turkish State Railways. The contract was signed in December 2011 and the construction work continues swiftly.

Detail