Antalya Elmalı 60 MW Remote Offset Solar Power Plant

  • Antalya Elmali GES 002
  • Antalya Elmali GES 010
  • Antalya Elmali GES 012
  • Antalya Elmali GES 014
  • Antalya Elmali GES 027
  • Antalya Elmali GES 030
  • Antalya Elmali GES 043
  • Antalya Elmali GES 051
  • Antalya Elmali GES 028
  • Antalya Elmali GES 054
  • Antalya Elmali GES 069
  • Antalya Elmali GES 073
  • Antalya Elmali GES 093
  • Antalya Elmali GES 088
  • Antalya Elmali GES 103
  • Antalya Elmali GES 095
  • Antalya Elmali GES 113
  • Antalya Elmali GES 106
  • Antalya Elmali GES 115
  • Antalya Elmali GES 114
  • Antalya Elmali GES 120
  • Antalya Elmali GES 125
  • Antalya Elmali GES 139
  • Antalya Elmali GES 149
  • Antalya Elmali GES 181
  • Antalya Elmali GES 182
    FACTS & FIGURES
    Client :

    Özaltın Hotel Establishments Inc.

    Location:

    Elmalı, Antalya, TÜRKİYE

    Project Area:

    850,000 m2

    Installed Capacity:

    60 MW

    Annual Power Generation:

    100 GWh

    Inverter Data:

    352 kVA x 154

    Number of Panels:

    110,000

    Commencement Date:

    March 2023

    Commissioning Date:

    August 2023

    Elmalı, a utility-scale photovoltaic solar park connected through the utility grid, with an installed capacity of 60 MW, was implemented by Özaltın Hotel Establishments Inc. on a land covering 85 hectares in a single location in Elmalı district in Antalya province, Türkiye. The project included the design, building, financing, operation, and management of the entire power station. The field was selected based on the availability of the highest solar radiation zones in Türkiye.

    Groundbreaking, with partial vegetation removal, soil grading, and leveling, was held in March 2023. Construction involved 60,000 meters of hole-drilling for the installation of the galvanized vertical steel piles, as well as the ground mounting of a total of 110,000 half-cut, bifacial, monocrystalline photovoltaic (PV) panels with 154 inverters, and a total of a 6-kilometers long high-fidelity cable laying. For power management, a 170-kV switchyard with 11 transformers, and a 5-kilometer long, 170-kV high-voltage overhead powerline were built as an integral part of the project to transport the generated electrical power to the national transmission network system. Following project construction completion on 10 July 2023, the solar power plant was tested and commissioned in August 2023 and started officially producing clean electricity. This renewable energy farm is expected to generate an average output of 100 GWh per annum, which will offset approximately 63,450 metric tons of carbon dioxide (CO₂) emitted per year.

    Essentially, this solar farm initiative was developed to meet the 50 million kWh of electricity demand by Özaltın Hotel Establishments Inc. While it operates as an offset plant, it effectively serves their self-consumption needs. All energy produced will be exported to the national grid and Özaltın Hotel Establishments Inc. will notably benefit by shifting to solar power consumption, while the estimated excess 50 million kWh produced power will be sold to the Turkish Electricity Market.

    FACTS & FIGURES
    Client :

    Özaltın Hotel Establishments Inc.

    Location:

    Elmalı, Antalya, TÜRKİYE

    Project Area:

    850,000 m2

    Installed Capacity:

    60 MW

    Annual Power Generation:

    100 GWh

    Inverter Data:

    352 kVA x 154

    Number of Panels:

    110,000

    Commencement Date:

    March 2023

    Commissioning Date:

    August 2023