Uşak (City Center) Sewerage and Storm Water Project

  • 01 Usak Kanalizasyon Ve Yagmur Suyu Projesi
  • 02Usak Kanalizasyon Ve Yagmur Suyu Projesi
  • 03 Usak Kanalizasyon Ve Yagmur Suyu Projesi
  • 04 Usak Kanalizasyon Ve Yagmur Suyu Projesi
  • 05 Usak Kanalizasyon Ve Yagmur Suyu Projesi
  • 06 Usak Kanalizasyon Ve Yagmur Suyu Projesi
  • 07 Usak Kanalizasyon Ve Yagmur Suyu Projesi
  • 08 Usak Kanalizasyon Ve Yagmur Suyu Projesi (1)
  • 09 Usak Kanalizasyon Ve Yagmur Suyu Projesi
    FACTS & FIGURES
    Client :

    General Directorate of İlbank

    Contractor :

    Özaltın Construction Co., Inc.

    Location :

    Uşak (City Center), TÜRKİYE

    Discharge Capacity:

    1,970 lt/sec

    Total Pipeline Network Length:

    370 km

    Number of Pump Stations:

    4

    The project aims to construct the entire sewage system of Uşak Province, with a total capacity designed to serve 1,970 liters discharge per second. Within the project's scope, 370 kilometers of concrete pipelines (Dia. 150 mm-1,800 mm) have been constructed along with 4 pumping stations. The project completed in 2011.

    FACTS & FIGURES
    Client :

    General Directorate of İlbank

    Contractor :

    Özaltın Construction Co., Inc.

    Location :

    Uşak (City Center), TÜRKİYE

    Discharge Capacity:

    1,970 lt/sec

    Total Pipeline Network Length:

    370 km

    Number of Pump Stations:

    4