    FACTS & FIGURES
    Client:

    Ministry of Water and Irrigation

    Contractor:

    Mapa-Özaltın Joint Venture

    Location:

    JORDAN

    Capacity of Water Treatment Plant:

    30 x 106 m3/year

     

    Total Length of Pipeline Network:

    25.6 km

    Number of Pump Stations:

    4

    The construction, testing, and commissioning of Wadi Arab Water System II Project, situated in northern region of Jordan, undertaken by the Mapa-Özaltın Joint Venture, with completion in 2020. The facility features a treated water capacity of 30 million m3 per year and 82,000 m3/day. The project encompasses the establishment of 4 pumping stations and steel water pipeline at the length of 25.6 kilometers (Dia. 1,200 mm). Key components of the facility comprise a water intake building, pre-sedimentation and sedimentation basins, filtering, chemical addition and dewatering units, gravity thickeners and distribution units, sludge pumping stations and sludge ponds, drying beds, measuring stations, and water tanks.

    FACTS & FIGURES
    Client:

    Ministry of Water and Irrigation

    Contractor:

    Mapa-Özaltın Joint Venture

    Location:

    JORDAN

    Capacity of Water Treatment Plant:

    30 x 106 m3/year

     

    Total Length of Pipeline Network:

    25.6 km

    Number of Pump Stations:

    4