Sivas – Erzincan Railway Project, Section I

  • Sivas Erzincan Railway 01
  • Sivas Erzincan Railway 02
  • Sivas Erzincan Railway 03
  • Sivas Erzincan Railway 04
  • Sivas Erzincan Railway 05
  • Sivas Erzincan Railway 06
  • Sivas Erzincan Railway 07
  • Sivas Erzincan Railway 08
  • Sivas Erzincan Railway 09
  • Sivas Erzincan Railway 10
  • Sivas Erzincan Railway 11
  • Sivas Erzincan Railway 12
  • Sivas Erzincan Railway 13
  • Sivas Erzincan Railway 14
  • Sivas Erzincan Railway 15
  • Sivas Erzincan Railway 16
  • Sivas Erzincan Railway 17
  • Sivas Erzincan Railway 18
  • Sivas Erzincan Railway 19
    FACTS & FIGURES
    Client:

    General Directorate of Turkish State Railways (TCDD)

    Contractor:

    Özaltın-Özkar Joint Venture

    Location:

    Sivas-Zara Section, TÜRKİYE

    Length of Railway:

    74.47 km

    Total Excavation Volume:

    26,938,981 m³

    Total Fill Volume:

    8,263,661 m³

    Number of Viaducts:

    7 (3,232 m) – (Omega type pretension precast beams used)

    Number of Overpasses:

    12 – (Omega type pretension precast beams used)

    Number of Cut-and-Cover Tunnels:

    8 (2,013 m)

    Number of Underpass-Culverts:

    150 (6,769 m)

    The project, with its contract signed in 2017, includes the construction of the Sivas-Zara section of the Sivas-Erzincan Railway Line, an extension of the Ankara-Sivas High Speed Train Line, spanning 74.47 kilometers in length.

    The Sivas-Erzincan railway project is a high-standard railway line, being constructed between the cities of Erzincan and Sivas in Türkiye. The line is planned to be a double-track electrified and signaled one, facilitating both freight and passenger transportation, with a track distance of 4.5 meters and a platform width of 14.5 meters. Designed for a maximum speed of 250 km/h, the line features a minimum curvature of 4,000 meters and a maximum slope of 1.6%.  The railway line intended to be further extended to Erzurum and Kars, ultimately integrating with the Baku-Tbilisi-Kars Railway.

    FACTS & FIGURES
    Client:

    General Directorate of Turkish State Railways (TCDD)

    Contractor:

    Özaltın-Özkar Joint Venture

    Location:

    Sivas-Zara Section, TÜRKİYE

    Length of Railway:

    74.47 km

    Total Excavation Volume:

    26,938,981 m³

    Total Fill Volume:

    8,263,661 m³

    Number of Viaducts:

    7 (3,232 m) – (Omega type pretension precast beams used)

    Number of Overpasses:

    12 – (Omega type pretension precast beams used)

    Number of Cut-and-Cover Tunnels:

    8 (2,013 m)

    Number of Underpass-Culverts:

    150 (6,769 m)