Upper Beyhan Dam and HEPP Energy Transmission Line

  • 01 Beyhan 1 Baraji Ve Hes Enerji Iletim Hatti
  • 02 Beyhan 1 Baraji Ve Hes Enerji Iletim Hatti
  • 03 Beyhan 1 Baraji Ve Hes Enerji Iletim Hatti
    FACTS & FIGURES
    Client:

    General Directorate of Turkish Electricity Transmission Corporation (TEİAŞ)

    Investor:

    Kalehan Beyhan Energy Generation Co., Inc.

    Location:

    Elazığ – Diyarbakır, TURKEY

    Length of the Line:

    100 km

    Number of Towers:

    244

    Total Weight of Towers:

    3500 tons

    Status:

    In operation

    An energy transmission line has been constructed within the scope of this project. Through this line, the energy transmission is transferred between 380 kV Upper Beyhan Dam and HEPP - Diyarbakır 3 Substation.

    FACTS & FIGURES
    Client:

    General Directorate of Turkish Electricity Transmission Corporation (TEİAŞ)

    Investor:

    Kalehan Beyhan Energy Generation Co., Inc.

    Location:

    Elazığ – Diyarbakır, TURKEY

    Length of the Line:

    100 km

    Number of Towers:

    244

    Total Weight of Towers:

    3500 tons

    Status:

    In operation