Upper Kaleköy Dam and HEPP Energy Transmission Line
Two energy transmission lines have been constructed within the scope of this project. Through the first line, the energy transmission is transferred between 380 kV Upper Kaleköy Dam and HEPP – Lower Kaleköy Dam and HEPP; and through the second line, the energy transmission is transferred between 380 kV Lower Kaleköy Dam and HEPP – Beyhan I Dam and HEPP.