Genç - Servi Highway

  • Genc Byk 1
  • Genc Byk 2
  • Genc Byk 3
  • Genc Byk 4
  • Genc Byk 5
  • Genc Byk 6
  • Genc Byk 7
  • Genc Byk 8
  • Genc Byk 9
    FACTS & FIGURES
    Client:

    General Directorate of Highways (KGM)

    Contractor:

    Mapa-Cengiz-Özaltın Joint Venture

    Location :

    Genç - Servi Section (Bingöl), TÜRKİYE

    Length of Highway:

    24.98 km

    Platform Width:

    10 m (2x1 State Highway)

    Paving Type:

    Surface Treatment

    The Genç-Servi Highway Km: 0+000-24+980 section replenishment work project is a part of security roads, linking Genç district and Servi town in Bingöl province over a span of 25 kilometers. During the project’s execution, 5.95 million m3 of excavation work has been carried out. It was completed and put into service on October 15th, 2018, as a 2x1 state highway shortening the former one 9.5 kilometers.

    FACTS & FIGURES
    Client:

    General Directorate of Highways (KGM)

    Contractor:

    Mapa-Cengiz-Özaltın Joint Venture

    Location :

    Genç - Servi Section (Bingöl), TÜRKİYE

    Length of Highway:

    24.98 km

    Platform Width:

    10 m (2x1 State Highway)

    Paving Type:

    Surface Treatment