Kahramanmaraş-Göksun Highway

  • Kahramanmaras Goksun 1
  • Kahramanmaras Goksun 2
  • Kahramanmaras Goksun 3
  • Kahramanmaras Goksun 5
  • Kahramanmaras Goksun 6
  • Kahramanmaras Goksun 7
  • Kahramanmaras Goksun 8
  • Kahramanmaras Goksun 9
  • Kahramanmaras Goksun 10
    FACTS & FIGURES
    Client:

    General Directorate of Highways (KGM)

    Contractor:

    Özaltın Construction Co., Inc.

    Location:

    Kahramanmaraş – Göksun Section, TÜRKİYE

    Length of Highway:

    19.97 km

    Platform Width:

    26 m (2x2 State Highway)

    Paving Type:

    Asphalt Pavement

    Number of Bridges:

    1

    The highway project, located between Km:13+900 and 33+870 of Kahramanmaraş-Göksun State Highway, spans a total length of 19.97 kilometers. The tender of the project was held in 2019, and the construction commenced within the same year.

    Within the project’s scope, slope stabilizing, landslide treatment works and construction of 84 meters long interchange with different levels completed. Paving of 19.97 kilometers road completed at wearing course level in 2020 and the highway was put into service as a 2x2 divided state highway, shortening the previous one by 7.6 kilometers.

    FACTS & FIGURES
    Client:

    General Directorate of Highways (KGM)

    Contractor:

    Özaltın Construction Co., Inc.

    Location:

    Kahramanmaraş – Göksun Section, TÜRKİYE

    Length of Highway:

    19.97 km

    Platform Width:

    26 m (2x2 State Highway)

    Paving Type:

    Asphalt Pavement

    Number of Bridges:

    1