Erdemli-Silifke-Taşucu 13th Region Border Highway, Yeşilovacık-Aydıncık Section

  • 01 Mersin Silifke Hava 008
  • 02 Mersin Silifke Hava 009
  • 03 Mersin Silifke Hava 010
  • 04 Mersin Silifke Hava 017
  • 05 Mersin Silifke Hava 019
  • 06 Mersin Silifke Hava 029
  • 07 Mersin Silifke Hava 076
  • 08 Mersin Silifke Hava 080
  • 09 Mersin Silifke Hava 173
  • 10 Mersin Silifke Hava 175
  • 11 Mersin Silifke Hava 184
  • 12 Mersin Silifke Hava 033
  • 13 Mersin Silifke Hava 037
  • 14 Mersin Silifke Hava 060
  • 15 Mersin Silifke Hava 122
  • 16 Mersin Silifke Hava 163
  • 17 Mersin Silifke 076
  • 18 Mersin Silifke 007
  • 19 Mersin Silifke 011
    FACTS & FIGURES
    Client :

    General Directorate of Highways (KGM)

    Contractor:

    Özaltın Construction Co., Inc.

    Location :

    Yeşilovacık-Aydıncık Section, TÜRKİYE

    Length of Highway:

    28.51 km

    Platform Width:

    25 m (2X2 State Highway)

    Paving Type:

    Asphalt Pavement

    Number of Tunnels:

    9

    Length of Tunnels:

    26,760 m (9 Twin-Tube Tunnels, 13,320 m long one-way)

    Number of Viaducts:

    5

    The construction of Km:125+050-153+560 (Yeşilovacık-Aydıncık) section of Erdemli-Silifke-Taşucu 13th Region Border Road Project, is a 28-kilometer section of D-400 State Road (the Mediterranean Coastal Road), which is the southernmost highway of the east-to-west arterial highways in Türkiye.

    In 2017, upon completion of 4 tunnels with a total length of 2,500 meters, 7-kilometer section of the highway was put into service as a 2x2 divided highway. The ongoing project aiming to construct a divided road with high geometric standards, includes 5 tunnels with a combined length of 11 kilometers and 5 viaducts totaling 1,660 meters. Within this section, Akkuyu Nuclear Power Plant Intersection Project was also completed and put into service on 31st July 2022.

    Together with the previously completed tunnels, upon the completion of the new tunnels and viaducts, total length of the highway will be 28 kilometers, reducing the current length of 35 kilometers by 7 kilometers.

    FACTS & FIGURES
    Client :

    General Directorate of Highways (KGM)

    Contractor:

    Özaltın Construction Co., Inc.

    Location :

    Yeşilovacık-Aydıncık Section, TÜRKİYE

    Length of Highway:

    28.51 km

    Platform Width:

    25 m (2X2 State Highway)

    Paving Type:

    Asphalt Pavement

    Number of Tunnels:

    9

    Length of Tunnels:

    26,760 m (9 Twin-Tube Tunnels, 13,320 m long one-way)

    Number of Viaducts:

    5