Erdemli-Silifke-Taşucu 13th Region Border Highway, Melleç-Kaledran Section

  • Erdemli Silifke Taşucu 13Th Region Melleç Kaledran (1)
  • Erdemli Silifke Taşucu 13Th Region Melleç Kaledran (2)
  • Erdemli Silifke Taşucu 13Th Region Melleç Kaledran (3)
  • Erdemli Silifke Taşucu 13Th Region Melleç Kaledran (4)
  • Erdemli Silifke Taşucu 13Th Region Melleç Kaledran (5)
  • Erdemli Silifke Taşucu 13Th Region Melleç Kaledran (6)
  • Erdemli Silifke Taşucu 13Th Region Melleç Kaledran (7)
  • Erdemli Silifke Taşucu 13Th Region Melleç Kaledran (8)
  • Erdemli Silifke Taşucu 13Th Region Melleç Kaledran (9)
  • Erdemli Silifke Taşucu 13Th Region Melleç Kaledran (10)
  • Erdemli Silifke Taşucu 13Th Region Melleç Kaledran (11)
  • Erdemli Silifke Taşucu 13Th Region Melleç Kaledran (12)
  • Erdemli Silifke Taşucu 13Th Region Melleç Kaledran (13)
  • Erdemli Silifke Taşucu 13Th Region Melleç Kaledran (14)
  • Erdemli Silifke Taşucu 13Th Region Melleç Kaledran (15)
  • Erdemli Silifke Taşucu 13Th Region Melleç Kaledran Card
    FACTS & FIGURES
    Client:

    General Directorate of Highways (KGM)

    Contractor:

    Özaltın-Yapı ve Yapı Joint Venture

    Location:

    Melleç-Kaledran Section, TÜRKİYE

    Length of Highway:

    11,397 km

    Platform Width:

    26 m (2x2 State Highway)

    Paving Type:

    Asphalt Pavement

    Number of Tunnels:

    6

    Length of Tunnels:

    13,860 m (6 Twin-Tube Tunnels, 6,930 m long one-way)

    Number of Viaducts:

    5 (Maximum pier height of viaducts is 90 meters)

    Number of Balanced Cantilever Bridges:

    2

    Construction of Km:233+250-244+647 (Melleç-Kaledran) section of Erdemli-Silifke-Taşucu 13th Region Border Road Project, is the final 11.4-kilometer part of D-400 State Road (the Mediterranean Coastal Road), which is the southernmost highway among the east to west arterial highways in Türkiye.

    Once completed, the Mediterranean Coastal Road will connect the neighboring cities of Mersin and Antalya with a 2x2 divided highway featuring high geometric standards. It will serve as a crucial link, connecting two cities with the farthest centers from each other in Türkiye.

    Within the scope of the final 11.4-kilometer part of Erdemli-Silifke-Taşucu 13th Region Border Road Project, there are 6 twin-tube tunnels with a total length of 6.9 kilometers (one-way), 5 viaducts with a total length of 3,000 meters and 2 balanced cantilever bridges.

    FACTS & FIGURES
    Client:

    General Directorate of Highways (KGM)

    Contractor:

    Özaltın-Yapı ve Yapı Joint Venture

    Location:

    Melleç-Kaledran Section, TÜRKİYE

    Length of Highway:

    11,397 km

    Platform Width:

    26 m (2x2 State Highway)

    Paving Type:

    Asphalt Pavement

    Number of Tunnels:

    6

    Length of Tunnels:

    13,860 m (6 Twin-Tube Tunnels, 6,930 m long one-way)

    Number of Viaducts:

    5 (Maximum pier height of viaducts is 90 meters)

    Number of Balanced Cantilever Bridges:

    2